尊龙凯时体育

CN

Warmly celebrate the official start of the construction of the second phase of Huaining Energy

At 9:18 a.m. on January 19, 2022, with the sound of firecrackers at the scene, the first pipe pile was slowly buried in the planned land. So far, the construction of the second phase of 6GW heterojunction cell (HJT) and 6GW photovoltaic module project of Jiangsu Huaining Energy Technology Co., Ltd. has officially started, which marks the development of Huaining Energy Company has entered a new stage. Chen Yubing, director of the development zone, Shen Min, the company's chief operating officer, and Wang Fan, deputy general manager, were invited to participate with the company's main leadership team members.
 
Heterojunction cell (HJT), as a new generation solar cell solution, has many advantages such as high photoelectric conversion efficiency, thin cell thickness, short process flow, low investment and low maintenance cost. In addition, its light-induced attenuation is lower than that of PERC and TOPCon, the 10-year attenuation rate is less than 3%, and the 25-year attenuation rate is only 8%. Under the same aging degree, the available power generation capacity is high. It can be widely used in different fields such as solar panels, urban public transportation, communication equipment, power installation engineering, national defense technology, etc. It has the advantages of industrialization in the current environment, and has the possibility of becoming a mainstream battery technology in the foreseeable future.
The Heterojunction Cell (HJT) project of Jiangsu Huaining Energy Technology Co., Ltd. is expected to have a total investment of 4.5 billion yuan, an estimated annual output value of 15 billion yuan, and a profit and tax of 600 million yuan.
Every roar of the machine is like a drum beat, which is exciting. 2022 is a milestone year for the company. The second-phase heterojunction project is a milestone in the company's development history.
 

 
 
Sitemap